§ 10-30. Site plan.  


Latest version.
  • Each application to the county public health unit for a permit required by this article shall be accompanied by a site plan certified by a state registered professional engineer. Such site plan shall contain:

    (1)

    An accurate map depicting the exact location of land application and septage or sludge processing.

    (2)

    A stormwater plan demonstrating that all stormwater runoff generated by a 25-year frequency storm will be prevented from entering or leaving the septic land application site.

(Ord. No. 87-17, § 4, 4-9-87)